Login
MIS Reports
Swachh Bharat Mission (Rural)
English |
हिंदी
Welcome User
Plastic Waste Management
Separate write up on proposed strategy for Plastic Waste Management in the State including O&M arrangement to be attached.
View PDF
States are to fill relevant data in the designated boxes. Colored boxes (with pre filled data) are not to be edited.
Print
ExportToExcel
PART- A
Existing status Of Plastic Waste Management Units(PWMUs)/Material Recovery Facilities(MRFs)
Sr.No.
Total no. of blocks in the District/Uts
No. of Rural PWMUs as on 31.12.2024
No. of blocks mapped with Rural PWMUs as on 31.12.2024
No. of blocks having linkage with urban MRF as on 31.12.2024
Total No. of blocks covered with (Rural PWMU + urban MRF) as on 31.12.2024
Expected-Total No. of blocks to be covered with ( Rural PWMU + Urban MRF) as on 31.03.2025
Residual blocks to be covered in 2025-26
Total no. of PWMUs sending plastic waste for Road Construction
Total no. of PWMUs sending plastic waste to cement klins
[1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
[9]
[10]
1
PART-B
PWM Plan 2025-26
Sr.No.
No. of blocks planned in which Rural PWMU will be set up during 2025-26*
No. of blocks planned to be mapped with Rural PWMUs during 2025-26*
No. of blocks planned to be linked with Urban MRF during 2025-26*
Total No. of Blocks planned to be covered ( with Rural PWMU + Urban MRF)
No. of Vehicle to be purchased for transporting of Waste Plastic from Villages to Rural PWMU/Urban MRF
1
Quarterly plan for PWM for 2025-26
Sr.No.
Q1
Q2
Q3
Q4
Total
1
No. of Blocks proposed to be covered with PWM
PART-C
Component-wise details of PWM Plan 2025-26
Components
Funding permissible under SBM-G
Physical plan (in number)
Total funds required (Rs. lakh)
Source of funding (Rs. in lakh)
Projected requirement of SBM-G Funds subject to cap in Column (2)
15th FC Funds (Additional)
MGNREGS
Business model/ Private funds
Other source, if any (SFC/ MPLAD/ MLALAD/ CSR, etc. - pl. specify)
[1]
[2]
[3]
[4]
[5]
[6]
[7]
[8]
[9]
Setting up of PWMUs/MRFs
No. of PWMUs/ MRFs
Rs.16 lakhs per block*
No. of Blocks
No. of Vehicle to be purchased for transporting of Waste Plastic from Villages to Rural PWMU/Urban MRF
NA
NA
NA
NA
No. of PWMUs to be linked for usage of waste plastic in Road Construction
NA
NA
NA
NA
NA
NA
NA
No. of PWMUs to be linked with Cement Kiln for Co- processing of waste plastic
NA
NA
NA
NA
NA
NA
NA
O&M of PWMUs/MRFs (Focus on Business Model)
NA
NA
NA
Functionality : PWMUs (Overall)
Sr.No.
Components
Total Numbers upto 31.12.2024
Total Functional upto 31.12.2024
Total Non-functional upto 31.12.2024
Remarks
1
2
3
4
5
6
1
PWMUs
under construction
Back